A price tolerance is the gap between the PO price and the invoice price that you accept without a query. What is purchase order?
Before you start
- Purchase Orders module
The MYOB Acumatica way
Where to find it: Vendors (AP303000) > Receipt Actions
- Open Vendors (AP303000) and go to the Receipt Actions section.
- Set Min. Receipt (%) and Max. Receipt (%). Each is the quantity as a percent of the quantity ordered. Less than the minimum or more than the maximum is not accepted at the warehouse.
- If you do not set a minimum or maximum, use Threshold Receipt (%). It is the minimum percent of the purchased items that must arrive to complete the order.
- Pick the Receipt Action: Reject, Accept but Warn or Accept.
- Tick Allow AP Bill Before Receipt if bills for this vendor can be entered before a purchase receipt exists.
Limits in MYOB Acumatica
- The tolerance is on quantity received as a percent of quantity ordered. No price tolerance is described in the vendor help.
- When Inventory is on, each bill line with a stock item must link to a line on a purchase order or purchase receipt. Use Add PO Receipt, Add PO Receipt Line or Add PO on the Details tab, or Link Line.
Good to know in MYOB Acumatica
- Example: Min. Receipt 90 and Max. Receipt 110 on an order for 100 units. A delivery of 85 or 120 units is outside the range and gets the Receipt Action.
- Accept but Warn lets the goods in and raises a warning on the line. Reject stops the receipt of those items.
Words MYOB Acumatica uses
- Purchase receipt. A record that goods arrived, used to bill the right quantity.
Common mistakes
- Expecting a price tolerance. The vendor settings cover quantity received against quantity ordered.
- Picking Accept but Warn when you want receipts outside the range stopped. Choose Reject for that.
More help
- How to set a price tolerance on purchase order matching in Sage 200
- How to set a price tolerance on purchase order matching in Sage Intacct
- How to set a price tolerance on purchase order matching in SYSPRO
- How to match a bill to a purchase order in MYOB Acumatica
- How to handle a partial delivery against a purchase order in MYOB Acumatica
- How to check bill lines against agreed vendor prices in MYOB Acumatica
- All MYOB Acumatica how-to guides
- Pulsify setup guides
Sources
Last checked 2026-10-19. Confidence: confirmed.
Common questions
Can MYOB Acumatica set a price tolerance?
The vendor help describes a quantity tolerance only: quantity received as a percent of quantity ordered. No price tolerance is described.
Where do I set the tolerance?
On the vendor, in the Receipt Actions section. Set Min. Receipt (%) and Max. Receipt (%). Or set a Threshold Receipt (%).
What happens outside the range?
You choose the Receipt Action. The options are Reject and Accept but Warn.